Decentralised Green Development Project (Hydro-Pico Turbine): Dated 17-08-2020

INR organised a Training programme at Dadeng Block office

Objectives:
1. Operators were sensitised about the aim of project and the small Pico-Turbine which generates electricity power of 0-5kW , must met such a criteria that the water from the source/stream is stored in a reservoir/weir and released at a minimum head of 10m down to the hydroger with a minimum discharge of 10lts/sec to get the desirable output Power.
2. VECs were enlighten about to create the Community Collection Fund by collecting from villagers to meet out the maintenance of Hydroger and besides to pay for the Operators if such need arises.
3. Operators were trained to have knowledge on to how to understand and implement the techniques of effective maintenance of Hydroger like proper surge protection earthing to Hydroger and the Electronic Load Controller to minimized the chance of failure/damaged.
4. That the Operators must kept in mind that the generated output Power of Hydroger that connected to Load Lighting of Houses, Lighting of Schools, Street Lighting and Community Lighting etc should not exceed the Maximum output Load Capacity of Hydroger.

Participants: Green Energy-MINR Team ;VECs members from 3 villages

Outcome:
• VECs along with the Operators were made to understand about the Roles and Responsibilities of VECs and the Operators
• With the help of PPT and a Video , Operators were sensitised about the aim of project and the small Pico-Turbine which generates electricity power of 0-5kW

Copyright 2019. All rights reserved.

Content maintained and updated by Institute of Natural Resources Management, Government of Meghalaya All Queries/Comments regarding the content on this site may be sent to minr.mbda@gmail.com