Installation and Training Programme on Hydroger for the FE’s and Operators: Dated 26-03-2021

Nagaland Empowerment of the People through Energy Development(NEPeD) and INR, Green Energy organised the programme at Kyiem, Mawphlang, East Khasi Hills District

Objectives:
The NEPeD teams and the FA(Green Energy-MINR) conducted a hydroger installation and training to the local operators for O&M the Pico-turbine,Penstock,Power House;where the ELC, damp load needs tobe adjusted for steady flow of the output power,wire connection and transmissions( streets lighting and domestic load)it is therefore , essential to organise a training programme and educate the local operators from Kyiem for smooth functioning,maintenance and operations of the Hydroger,thus, benefits and enhance quality of life by providing electricity to households, water lifting for drinking and irrigation facilities to the local residents .

Participants: NEPeD Team,Green Energy-MINR Team ; VECs kyiem; Mawsadang-1 (operator); Sunei-1 (operator)

Outcome: The Power generated from the Pico-Turbine Hydro Generator is being used for Community Hall Lighting, Street Lighting & Households Lighting

Copyright 2019. All rights reserved.

Content maintained and updated by Institute of Natural Resources Management, Government of Meghalaya All Queries/Comments regarding the content on this site may be sent to minr.mbda@gmail.com